Home
Recreational Use
Environmental Research
Neighbors
Other
Cross Country Ski Trails
Mountain Bike Trails
Barnhouse Project
Green Certifications
Barn/House Site
Overview Design Plans
Design Plans
Mechanical Plans
Exterior Views
Site and Landscape Plans
Architectual Plans
Timber Frame Plans
Timber Frame Stair Plans
Electrical Plans
Windows
Radiant Floor Products
Bedrooms
Bathrooms
Kitchen
Stairs
Barnhouse Systems
Overview Electric
Solar Electric
Lighting
Hydro electric dam
Generator
Overview Heating
Masonry Heater
Radiant Heat
Passive Solar Heat
Overview Plumbing Systems
Composting Toilets
Bathroom Fixtures
Grey Water System
Barnhouse Process
Overview Building Process
Were do houses come from?
Saw Mill Operation
Timber Frame Process
Timber Frame Tools
Timber Frame Joints
Site Preparation
Foundation Installation
Timber Frame Raising 1st Floor
Timber Frame Sealing and Finish
Timber Frame Raising
Envelope Framing
Roofing System
Insulation
Radiant Floors
Plaster and Painting
Construction Waste Management
Lessons Learned
Contact us
Green Woodlands Foundation
Connecting with Nature
Architectual Plans
Below are PDFs of the Architectual Drawings as of the date noted.
A0.00 General Notes, Abbreviations, Symbols & Materials 8/31/06
A0.01 Door Schedules and Types, Door and Window Details 08/31/06
A1.01 Basement Foundation Plan, Foundation Elevation Details 8/31/06
A1.02 First and Second Floor Plan, Wall Types 08/31/06
A1.03 Roof Plan and Monitor Plan 08/31/06
A2.01 Building Elevations 08/31/06
A3.01 Building Sections 8/31/06
A3.02 Building Sections 8/31/06
A3.03 Bulding Sections 8/31/06
A3.04 Building Sections 8/31/06
A4.01 Details (01)(2) Foundation (3) Floor edge (4) Roof edge (5) Top of Foundation (6) Top of Foundation @ Mud Room 8/31/06
A4.02 (1) Roof Edge at Overhang (2)(3) Monitor Detail 8/31/06
A4.03 Stair Details 8/31/06
SKA-06 Revised Wall and Roof Section Oct 30, 2006
SKA-7 Revised Garage Door Details 03/05/07
SKA 7.1 Revised Garage Door Details 03/05/07
SKA 7.3 Mudroom Door Details 08/17/07
SK-8 Toilet Locations 03/05/07
SKA-10 Bath 04/23/07
SKA-22 Revised Grate Size Increased 08/17/07
Below are the Architectual Written Specifications.
Division 1 General Requirements